You are not subscribed to this list pig333.com in 3 minutes

Weekly newsletter with all the pig333.com updates

Log in and sign up on the list

Articles - Management

Figure 1. Graphical representation of the standing reflex, ovulation, and optimal AI timing in a sow with a 60h estrus. Source: Carles Casanovas.

What insemination method should I use?

We continue our series of articles in which swine reproduction and artificial insemination expert Javier Gil shares key points about proper management to improve fertility and prolificacy. This article addresses the criteria to establish correct insemination methods.

Welcome to 333

Connect, share, and interact with the largest community of professionals in the swine industry.

Celebrating 202179Users on 333!

Sign upAlready a member?

Users can sign in with Google to personalize the experience, save preferences, or access additional features.

Gilt replacement simulator

Tool that allows you to calculate the replacement rate in your farm

The most...

    Figure 1. With post-cervical insemination the semen is deposited in the uterine body, past the cervix.

    Post-cervical insemination

    For several years now, post-cervical insemination has become common on most pig farms. In this article we review with Javier Gil, a specialist in swine reproduction and artificial insemination, what to keep in mind in order to do this technique correctly.

    Pig glossary

    Definition for the most commonly used pig terms

    + Likes

      Water medication calculator

      Simulator that calculates the amount of drug to add to the water when using a flow dispenser.

      Welcome to 333

      Connect, share, and interact with the largest community of professionals in the swine industry.

      Celebrating 202179Users on 333!

      Sign upAlready a member?

      Users can sign in with Google to personalize the experience, save preferences, or access additional features.

      Gilt replacement simulator

      Tool that allows you to calculate the replacement rate in your farm

      It is imperative to heat detect with the male in front of the sows. The farm worker must play an active role in heat detection; touching, pressing on the sows without scaring them.

      Tips for heat detection

      In the first part of this article series we addressed how to correctly stimulate oestrus. In this article we continue talking with swine reproduction specialist, Javier Gil Pascual, focusing on heat detection.

      The most...

        Pig glossary

        Definition for the most commonly used pig terms

        + Likes

          Water medication calculator

          Simulator that calculates the amount of drug to add to the water when using a flow dispenser.

          You are not subscribed to this list pig333.com in 3 minutes

          Weekly newsletter with all the pig333.com updates

          Log in and sign up on the list